Selected significant references:

ABB s.r.o.

2011, Vídeňská 117, 619 00 Brno, Reconstruction 22 kV cells in Energetika Kuřim, a.s., 5 cells - replacement relais, frames and cable feed in substation R22

2011, , ,

AmpluServis, a.s.

2011, Elektrárenská 32/5558, 709 74 Ostrava - Třebovice, Frequency drive for the feed pump - heating plant Dalkia Olomouc, Replacment frequency converter and motor of the feed pump, MV switchgear ZS1 type , 6kV, 630A, 25kA - 5 cubicles, air conditioning supply Supplement the existing switchgear, ZS1 type switchgear, 6kV, 1250A - 2 fields and supply and installation of ZS1 type switchgear, 6kV, 630A, 25kA - 5 fields

ELDAT a.s. - Arcelor Mittal

2011, Ostrava, ,

2011, , ,

MERO ČR, a.s.

2011, Veltruská 748, 278 01 Kralupy nad Vltavou, UPS for 3 gate chamber , Renewal UPS for GC Moutnice , Radostín, Rajhrad.

2011, , ,

2011, , ,

2011, , ,

PVK, a.s.

2011, Hlavní 22, 250 75 Káraný, Restoring evacuation pumps, Motor, vacuum pumps, technology reconstruction supply new cabinets for RIFLEX system

2010, , ,

ABB s.r.o.

2010, Brno, Design - Switchgear ZS1, Abu Shabka - Switchgear 11 kv Al Shomally - Switchgear ZS1 - 3,3kV a 11kV Basrah Iraq - 15 panels - 3,3kV

2010, , ,

Hydro Carbon Supply JORDAN

2010, Jordan, Switchgear ZS1 - 15 panels, Supply Switchgear ZS1 - 15 cabinets- 3,3kV; 1250A; 31,5kA pro South Refinery Basrah, Iraq

MERO ČR, a.s.

2010, Kralupy n. Vltavou, ,

MERO ČR, a.s.

2010, Kralupy n. Vltavou, ,

MERO ČR, a.s.

2010, Kralupy n. Vltavou, ,

MERO ČR, a.s.

2010, Veltruská 748, 278 01 Kralupy nad Vltavou, ,

2010, , ,

2009, , ,

2009, , ,

2009, , ,

2009, , ,

ENERGOSYS LLC

2009, NEW YORK, Components for PV Power plant Zbysov, Supply of components: CSS UniPack NEPTUN 7.18 CSS UniPack ORION 1000M CSS UniPack ORION 1000M Ref. Nr. ERIP090105

2009, , ,

MERO ČR, a.s.

2009, Veltruská 748, 278 01 Kralupy nad Vltavou, New switchboard for R6 - 6 kV, Supply and installation of the new switchboard Switchgear 1, UniGear type ZS1, 6kV, 1250A, 25kA - 9 cabinets for the power output 6 kV substation. Placement of substation in the outdoor container. Ref. č. ERIP090155

NWR Energy, a.s.

2009, Gregorova 2582/3, 728 37 Ostrava - Moravská Ostrava, Reconstruction of compensation switchboards - OKD, Reconstruction of compensation switchboards at with protected steps. Restrofit cubicles by circuit breaker VD4, SACE V7.

2009, , ,

PETROLCOMET Co., Bulevar Despota Stefana 15, Belgrad, Serbia

2009, Tripoli, Lybia, Suplly 9 independent cells 36kV (rectified), 9 units of M.V. self standing cubicle 36kV – cable IN / cable OUT EVOS 2 with equipment Ref. Nr. ERIP090036

Pražská vodohospodářská společnost a.s.

2009, Cihelná 4/548, 118 00 Praha, Back up generator for disposal of chlorine - waterworks Zelivka, Bask up diesel generator and substation in the Želivka drinking water treatment plant

Česká rafinérská, a.s.

2008, Záluží 2 , Litvínov, Components of the regulated drive 2.5 MW, Supply of the motor, frequency converter and high voltage switchgear - UniGear type ZS1, 6 kV, 1250 A, 25 kA - 3 cabinets Cooperation with Division Drives and Motors Rer. Nr. EPOP080019

MERO ČR, a.s.

2008, Veltruská 748, 278 01 Kralupy nad Vltavou, Increased reliability of supply pumping station Benesovice, Supply and installation of HV UniGear ZS1, 22kV, 1250A, 25kA, the 2 boxes for improving of suply pumping station Benesovice Ref. Nr. ERIP080126

Železárny Hrádek u Rokycan

2008, Nová Huť 204, 338 42 Hrádek u Rokycan, Reconstruction of Input Cellular Substation R26 - 22kV, Renovation of substation 22 kV in ironworks Hradek. UniGear ZS1, 22kV, 1250A, 20kA - 5 fields incl. supply cable for the substation R26 and new cable bridge. Ref. Nr. ERIP080053

INELSEV s.r.o.

2007, Husitská 1716 434 01 Most , Compensation switchboards for Ceska reafinerska a.s., Delivery and installation of M.V. switchboard including retrofit of 6kV substation - circuit breaker VD4 , V-Contact Medium voltage vacuum contactors SACEV7

Česká rafinérská, a.s.

2006, Záluží 2 , 436 70 Litvínov, Retrofit of switchgear type SR12, VH126 and VH151 (ABB), Delivery of withdrawable parts with VD4 circuit breaker for retrofit switchgear SR12, VH126 and VH151

OKD, a.s. Member of KARBON INVEST, a.s.

2006, Prokešovo náměstí 6/2020, 728 30 Ostrava, Reconstruction of Compensation Station at Mine Darkov - 2nd part, 2nd part: filtering of higher frequencies Realization and project technical documentation at 22 kV - harmonics compensation and filtration.

Precheza, a.s.

2006, nábř. Dr. E. Beneše 1170/24, 751 62 Přerov, Repair of substation - canal "A" , Replacement and addition of wires, cables, circuit breakers and switching elements

SKANSKA DS a.s.

2006, Perucká 7/2482, 121 44 Praha 2 - Vinohrady, Reconstruction pumping stations - Karany, Repair of supply cables between substation and pumping station . Reconstruction of supply switchboard for pumping stations.

Bosch Rexroth, spol. s r.o.

2005, Hviezdoslavova 5, Brno, Central Reactive Power Compensation, Complex service during maintainance and reconstruction of compensation device at main substation of production plant.

DURA-LINE CT, s.r.o.

2005, U písáku 682, 763 62 Tlumačov, ,

ČEZ, a.s.

2005, Duhová 2/1444, Technical Project Documentation, Technical documentation for project "Frequency converters for fluidized bed boiler at Power Station Porici 2". The documentation includes drawings of drives control systems of ventilators, high power circuits of 6 kV switchgear bay and dislocation arrangement of cable runs.

MORAVOLESK,a.s.

2005, Životského 4/44, 618 00 Brno, ,

OKD, a.s. Member of KARBON INVEST, a.s.

2005, Prokešovo náměstí 6/2020, 728 30 Ostrava, Reconstruction of Compensation Station at Mine Darkov, Reconstruction of Compensation Station in Mine Darkov 5th harmonic/9.53Mvar, 11th harmonic/8.45Mvar

Pražská vodohospodářská společnost a.s.

2005, Cihelná 4/548, 118 00 Praha 1, Capacitive Currents Decompensation at Cable Network, At energy network of Water Station Karany came to permanent overcompensation at 22 kV of capacitive power due to long cable runs at its network. The solution was installation of regulated decompensation device 600 kvar (12 decompensation inductors with decompensation power of 50 kvar).

Pražská vodohospodářská společnost a.s.

2005, Cihelná 4/548, 118 00 Praha, Energocentrum Sojovice - II. Stage, Finishing of supply cable system for water station area of artificial infiltration and all data transfer systems for control of technological processes. Utilization of optic cables, control system Rittmeyer WSR3000 and visual system LookOut.

PRECHEZA a.s.

2005, nábř. Dr. E. Beneše 24, 750 62 Přerov, ,

RMS CHEMACRYL, a.s. Sokolov

2005, , ,

SLÉVÁRNA KUŘIM, a.s.

2005, Blanenská 157, 664 34 Kuřim, ,

Ing. Ivan Fiala - PROJEKTY

2004, Lečkova 1521/15, 149 00 Praha, Project Dokumentation for Water Supply Technologies, Documentation for construction of electrotechnical part of "ENERGOCENTRUM Sojovice". Completion of supply system and data transfer between facilities of Prague water supply system.

Johns Manville Slovakia a.s.

2004, Strojárenská 1, Trnava (SK), Metling Unit - Boosting, Delivery and installation of boosting for melting unit TA no.3 according to project documentation of GLASS SERVICE, a.s. The boost melting includes 54 molybdenum electrodes divided into 6 sections. These are vertically inserted into the bottom of melting pool. The regulation is provided with 3phase regulation transformers in Scott connection. Sections are controlled from main control system of the glass plant or directly at controlling swithboards.

PRAGIS a.s.

2004, Na Prosecké vyhlídce 3/807, 190 21 Praha, Sewer System Construction - Karany, The technology included secondary switchboards with protection IP54, installation of submerible pumps, ventilator ducts, ultrasonic water level meter and induction flowmeter as well as communication station via GSM modem.

Pražské vodovody a kanalizace a.s.

2004, Národní 13, 110 00 Praha, LV Cables Repair at pumping stations Sojovice, Repair of LV supply cables between stations R14, R15 and R16 and substation TR/C and pumping station R24. Reconstruction of supply switchboard for pumping stations.

Pražské vodovody a kanalizace a.s.

2004, Národní 13, 110 00 Praha, Reconstruction of Substation 22 kV Breakdown, Reconstruction of voltage measurement part after destruction of voltage transformers due to electrical discharge (switchboard at 22 kV).

PRECHEZA a.s.

2004, nábř. Dr. E. Beneše 24, 750 62 Přerov, Technical Documentation for Compensation Device, Documentation for compensation swichboard 300 kvar, 400 V and control system for reactive power compensation.

PRECHEZA a.s.

2004, Nábř. dr. E. Beneše 24, Přerov, Reconstruction of Service Cables 6 kV for Blower K-System, Reconstruction of 250 m long cable run at the chemical plant between substation 6 kV R30 and blower drives M12, M13 structure (250 kW).

VÍTKOVICE STEEL, a.s.

2004, Štramberská 2871/47, 709 00 Ostrava, ,

Vodovody a kanalizace Kroměříž, a.s.

2004, Kojetínská 3666, 767 01 Kroměříž, Compensation Device Reconstruction, Replacement of existing individual reactive power compensation with stepwise switching device. Setting up for future eventual protecting with inductors.

ABB s.r.o.

2003, Sokolovská 84-86, 186 00 Praha, Renovation of Compensation Station at 6 kV Line HCC ISPAT NOVÁ HUŤ a.s., Innovation of existing secondary case switchboard 6kV. Replacement of old carriages with new ones with vacuum breaker ABB VD4. Replacement of instrument current transformers, auxiliary LV equipment in control superstructures of 6 kV switchboard and implementation of indicators into auxiliary LV switchboard.

ABB, s.r.o.

2003, Sokolovská 84-86, 186 00 Praha, TPCA Car Factory, Kolín - Ovčáry, Design, delivery and installation of protected central compensation 22 kV, 12 Mvar.

AUTEL, a.s.

2003, Oldřichovice č. 790, 739 61 Třinec, Compensation Device at 6 kV with 3rd and 5th Harmonics Filters for Trinec Ironworks, Design, delivery, installation and breaking-in of indoor compensation device. 3rd harmonic filter with installed power 2 Mvar includes air compensation inductors, capacitor bank, damping resistors and transformer of balanced protective system. 5th harmonic filter has compensation power of 3.7 Mvar and similar configuration. Delivered auxiliary LV switchboard includes protection for capacitor bank and for signalization and measurement elements.

Bekaert Bohumín s.r.o.

2003, Drátovenská 366, 735 51 Bohumín, Main Plant Substation – Adjustment of Installation for New Technology, Renovation of distribution LV switchboards RH1 and RH2 and reconstruction of central compensation according to undertaken analysis of electrical energy consumption (power balance and evaluation of harmonics effects).

Biocel Paskov a.s.

2003, Zahradní 762, 739 21 Frýdek-Místek, Energetic analysis, Definition of technical requirements for Saw Mill Paskov for connecting into in-plant supply network of Biocel considering EMC and reative power balance.

Cement Hranice, akciová společnost

2003, Bělotínská 288, 753 59 Hranice, Switchboards Renovation 10.5 Mvar, Total reconstruction and protection of 21 compensation switchboards (at 400 V, with main compensation power 500 kvar).

Cement Hranice, akciová společnost

2003, Bělotínská 288, 753 59 Hranice, Protected Compensation Switchboard 500 kvar, 400 V, Delivery of switchboard with a installation and fitting to distribution switchboard (main busbar 1000 A taken out through ceiling of supply field).

Elektro Fischer GmbH

2003, Angerstrasse 6, 956 71 Thanhausen, Germany, Electrical Installation for Saw Mill Paskov, Delivering and mounting of part of cabel installation for sorting and drying line.

ELTODO EG, a.s.

2003, Novodvorská 1010/14, 142 01 Praha 4, Design of Control Switchboard, Recontruction design of switchboard DT4 - control and visualization technology of water-pumping station.

ISPAT NOVÁ HUŤ a.s.

2003, Vratimovská 117/689, 707 02 Ostrava - Kunčice, Compensation Components, Delivery of elements for compensation switchboards in network 500 V IT.

KAROSA a.s.

2003, Dobrovského 74/II, 566 03 Vysoké Mýto, Section Nová lakovna, Reconstruction of compensation switchboards 400 V, 2x600 kvar.

KOVOHUTE TRENČÍN, s.r.o.

2003, Súvoz 1, 911 50 Trenčín, Slovenská republika, Industrial Network Power Analysis, Power Analysis including design, delivery and installation of protected compensation switchboard.

LINDE TECHNOPLYN a.s.

2003, U Technoplynu 1324, 198 00 Praha, Protected Compensation Switchboard 690 V, 250 kvar, Delivery, installation and put into operation of protected compensation device at plant Vertex Hodonice.

Pražská vodohospodářská společnost a.s.

2003, Cihelná 4/548, 118 00 Praha, Reconstruction of Input Cellular Substation 22 kV, Renovation of substation 22 kV at department Úpravna vody Káraný. Total reconstruction of switching devices and busbar connections. Rearrangement of control circuits and their integration into control visualization system.

Pražské vodovody a kanalizace a.s.

2003, Národní 13, 110 00 Praha, Reconstruction of Control Desk for Main Pump, Renovation of control, signalling and display components and all relevant circuits of control desk for pump no.1 and no.3.

Pražské vodovody a kanalizace a.s.

2003, Národní 13, 110 00 Praha, Reconstruction of Electrical Installation, Repair of motor switching for air pumps and switchboards RM at evacuative towers Sojovice, Predmerice, Kremen, Kbel a Vestec.

PROGRES Holešov, spol. s r.o.

2003, Tučapy 118, 769 01 Holešov, Substation of production plant for Greiner Packaging, Delivery of 0.4 kV switchboards for central supply system. Three main switchboards (eight fields) with rated current 2500 A are connected through busbars bridges for alternative backup supply including protected reactive power compensation.

SCHMACHTL CZ, spol. s r.o.

2003, Vestec 185, 252 42 Jesenice, Reconstruction of Electrical Installation, Reconstruction and modification of switchboard RM at substation R22 Sojovice for air pumps complementing at water system.

Severočeské doly a.s.

2003, Boženy Němcové 5359, 430 01 Chomutov, Analysis for Coal Mine Nástup Tušimice, Large analysis of network 110/35/6/0.4 kV considering EMC and reactive power balance.

Sprecher Automation GmbH

2003, Franckstrasse 51, A-4018 Linz, Austria, Electrical Installation for Saw Mill Paskov II., Installation of power and low voltage switchboards, cabling delivering and mounting. Installation and operation tests of drives, technology and safety circuits of sorting line for logs.

VÁLCOVNY PLECHU, a.s.

2003, Křižíkova 1377, 738 01 Frýdek - Místek, Industrial Network Power Analysis, Power analysis including conception for reactive power compensation.

Ostrava University of Technology

2003, Tř. 17. listopadu, 708 33 Ostrava - Poruba, Electrical Measurement Laboratory, Delivery and installation of secondary lab switchboard, measurement and testing working place and air condition.

DISA v.o.s.

2002, Barvy 784/1, 638 00 Brno, Chlorinator for Chlorine Production, Design, delivery and installation of control system in department Úpravna vody Káraný.

GLASS SERVICE, a.s.

2002, Rokytnice 60, 755 01 Vsetín, Control of Electrical Heating for Glass Furnace, Delivery of control switchboard for electrical heating AR1-2k2 (overseas packing for New Zeland).

Pražské vodovody a kanalizace a.s.

2002, Národní 13, 110 00 Praha, Design of Water Station Supply System, Complex design and engineering service for reconstruction of 6 substations 6 kV ZS1 UniGear (included supply switchboards of auxiliary circuits, cable runs and adjustment of protections at HV-level).

Pražské vodovody a kanalizace a.s.

2002, Národní 13, 110 00 Praha, Recontruction of Electrical Installation, Reconstruction of motor, socket and lighting electrical installation. Project included switchboards at water stations Dolnolabsko, Skorkov a Kochanky.

Pražské vodovody a kanalizace a.s.

2002, Národní 13, 110 00 Praha, Switchboards Reconstruction, Renovation of power and control switchboards of pumping station for raw water including integration into control system Sojovice.

PRECHEZA a.s.

2002, nábř. Dr. E. Beneše 24, 750 62 Přerov, Recontruction of Low Voltage Substations, Desing, delivery and installation of secondary substations 0.4 kV. The delivery included switchboards 1600 A and new cable room under the switchboards - substations R36 and R31.

STÖLZLE - UNION a.s.

2002, U Sklárny čp. 300, 330 24 Heřmanova Huť, Glass Works Hermanov, Delivery and installation of swithboards for electrical heating and power distribution of glassworks.

Vodovody a kanalizace Kroměříž, a.s.

2002, Kojetínská 3666, 767 01 Kroměříž, Central Substation Reconstruction, Compensation switchboard reconstruction - compact box module 600 mm into existing housing of central LV switchboard at department Úpravna vody Kroměříž.

Cement Hranice, akciová společnost

2001, Bělotínská 288, 753 59 Hranice, Compensation Switchboards Renovation - 1.5 Mvar, Reconstruction of compensation switchboards at 0.4 kV, 1.5 Mvar with protected steps. Design and installation of line conditioner for administration building.

Česká zbrojovka a.s.

2001, Svat. Čecha 1283, 688 01 Uherský Brod, Measurement, Analysis and Components Delivery, Electromagnetic compatibility assurance for newly installed NC machines.

Elektrizace železnic Praha, a.s.

2001, nám. Hrdinů 1693/4a, 140 00 Praha, Section VPŠT/01 Česká Třebová, Design, delivery and installation of compensation device.

Elektrizace železnic Praha, a.s.

2001, nám. Hrdinů 1693/4a, 140 00 Praha, Iron Removing Filter, Reconstruction of compesation switchboard.

KOVOBRASIV Mníšek, spol. s r.o.

2001, 252 10 Mníšek pod Brdy 905, Overvoltage Protection of Furnace Transformers, Processing of implementation documentation for realization of overvoltage protection for two furnace transformers 3 MVA and substation 22 kV. Delivery and installation according to design (arresters POLIM H25 and MWD25).

Pražská vodohospodářská společnost a.s.

2001, Cihelná 4/548, 118 00 Praha, Water Treatement Supply System, Construction of water treatment supply system and artificial groundwater recharge with energy and technology visualization for Energocentrum Sojovice.

Pražské vodovody a kanalizace a.s.

2001, Národní 13, 110 00 Praha, Reconstruction of Pumping Station "Vypich", Reconstruction of supply parts - input substation 22 kV, transformer station 22 / 0.4 kV. Delivering and installation of horizontal "new generation" pumps with continuous regulation of the speed that works into two water pressure zones. Delivering and installation of 0.4 kV switchboards with embedded frequency converters and all power distribution networks of pumping station.

Pražské vodovody a kanalizace a.s.

2001, Národní 13, 110 00 Praha, Switchboards Reconstruction, Renovation of switchboards at department Úpravna vody Káraný - artificial groundwater recharge Sojovice. Switchboards R2 400/230 V 50 Hz - central department switchboard, RU24 and RU110 24 and 110 V DC - standby and control supply.

Pražské vodovody a kanalizace a.s.

2001, Národní 13, 110 00 Praha, Overvoltage Protection Sytem, Design, delivery and installation of overvoltage protection sytem in large 0.4 kV network at depertment Úpravny vody Želivka.

Pražské vodovody a kanalizace a.s.

2001, Národní 13, 110 00 Praha, DT5 Switchboard Renovation, Control and power switchboard for pump drives, compressors and slide valves at department Úpravna vody Káraný.

Skloplast, a.s.

2001, Strojárenská 1, 917 99 Trnava, Slovenská republika, Melting Unit no.5, Delivery and installation of technology for electrical heating of glass furnace.

Brno University of Technology

2001, Údolní 244/53, 602 00 Brno, Power Energy Laboratory, Design, delivery and installation of switching arc laboratory with complete installation of new impulse capacitor bank, high voltage laboratory and power electronic laboratory. Complex modernization of dynamometer's control. In the lab was constructed the working place with electromagnetic shielded room.

Pivovar Janáček, a.s.

2000, Neradice 369, 688 16 Uherský Brod, Central Compensation of Production Plant, Complete reconstruction of compensation switchboards at LV level.

Pražská vodohospodářská společnost a.s.

2000, Cihlená 4/548, 118 00 Praha, Water Station Supply System, Total reconstruction of substation (unit Úpravna vody Káraný) 22 kV, 6 kV, 0.4 kV with energy and technology visualization. Reconstruction of main pump no.2 and its regulated drive 1.6 MW.

Showa Aluminium Czech, s.r.o.

2000, Unhošťská 2747, Kladno - Kročehlavy, Central Reactive Power Compensation 425 kvar at 400 V, Reconstruction of switchboard after breakdown. Replacement with protected compensation switchboard with dumping factor 14% (resonance frequency 134 Hz).

TŘINECKÉ ŽELEZÁRNY, a. s.

2000, Průmyslová 1000, 739 70 Třinec - Staré Město, Overvoltage Protection of Furnace Transformers, Reconstruction of protections against overvoltage with refilling with RC elements Phaso (VISHAY) at input 6 kV for three furnace transformers 2500 and 4000 kVA – design and realization.

ISPAT NOVÁ HUŤ a.s.

1999, Vratimovská 689, 707 02 Ostrava, Control Compensation Switchboard, Design and delivery of control compensation swithboard and filter device. Operation switchboard for substation of ladle furnace.

ISPAT NOVÁ HUŤ a.s.

1999, Vratimovská 689, 707 02 Ostrava, Continuously Regulated Compensation Filter 40 Mvar for MiniMill, Design, delivery, installation and breaking-in of continuously regulated compensation 40 Mvar, 22 kV for compensation reactive power, voltage fluctuation elimination and harmonics filtration from main and aux drives of rolling-mill. For more information – See Products.

ISPAT NOVÁ HUŤ a.s.

1999, Vratimovská 689, 707 02 Ostrava, Compensation Device 13.5 Mvar, Desing and delivery of compensation device for ladle furnace at 22 kV, 13.5 Mvar with filters of 3rd and 5th harmonics.

ISPAT NOVÁ HUŤ a.s.

1999, Vratimovská 689, 707 02 Ostrava, Compensation Device at 690 V, Design, delivery and installation of compensation device for rolling mill "Minihut" at 690 V.

KOVOBRASIV Mníšek, spol. s r.o.

1999, 252 10 Mníšek pod Brdy 905, Compensation Device for Arc Furnace at 22 kV with 3rd and 5th Harmonics Filters, Design, delivery, installation and breaking-in of compensation device at 22 kV in indoor design. 3rd harmonics filters with installed power 2.1 Mvar, 5th with 1.8 Mvar. These filters are based on compensation air-reactors and capacitors banks with all accessory equipment. The turnkey project covered also substation 22 kV with SF6 breakers, control switchboard and transformer for self energy consumption of the facility 22/0.4 kV, 1MVA.

PRECHEZA a.s.

1999, nábř. Dr. E. Beneše 24, 750 62 Přerov, Switching Station Reconstruction, Design, delivery and installation of device for back up of four supply transformers 6/0.4 kV, 1000 kVA at particular production segments of titanium dioxide.

PRECHEZA a.s.

1999, nábř. Dr. E. Beneše 24, 750 62 Přerov, Individual Compensation of HV motors, Design, delivery and installation of individual compensation HV motors for mills and compressors.